Project Estimate & Itemized Bid Ledger
Use this for a larger job with several cost categories. Add each labor, material, equipment, other, and subcontractor cost once, then set overhead and target margin to see the estimated project price and gross profit.
Enter the line items below. The estimate updates as you add or change costs.
Project Estimate & Itemized Bid Ledger
Build a multi-category cost sheet across labor, supplies, subs, and markup
Target margin 22.0%; actual after cent rounding: 22.0%
Side-by-Side Price Comparison
Same total job cost for all three bids: $7,661.92
Competitive / Volume Bid
Selected Target
Premium / Complex Scope
How the Estimate Is Built
Use separate cost categories to spot missing items and avoid counting the same cost twice:
Subcontractor costs: Track subcontractor quotes separately from in-house labor and check what each quote includes before adding other labor, burden, or insurance costs.
Worked Example
Illustrative multi-trade scope:
- Direct Labor (44 hrs @ $70/hr): $3,080.00
- Direct Materials (Framing package): $2,111.00
- Subcontractor scope: $1,650.00
- Equipment & Other: $0.00
- Overhead Rate: 12.0% of direct costs
- Target Profit Margin: 22.0%
The estimate includes entered line items and the selected overhead method. Add taxes, fees, and other project costs when they apply; the calculator does not verify supplier or subcontractor quotes.